Instructions for Use:
- If possible, leave in a warm place prior to use to help workability.
- Square up area to be repaired, remove loose debris and ensure the area is dry (a coat of bitument emulsion may improve adhesion on some surfaces).
- Pour in the tarmac.
- Rake over, leaving the centre standing proud.
- Press down tightly with a hand rammer or roller (moisten roller to prevent sticking).
- Lay a maximum of 30mm at any one time to ensure compaction. Maximum depth should not exceed 60mm.
- Add extra material as needed for a level surface.
- Allow to harden for at least 24 hours before use.